Nice Côte d’Azur Airport Terminal Boarding Gates Expansion

Nice Côte d’Azur Airport
Nice, France
Project Details
>
Nice Côte d’Azur Airport Terminal Boarding Gates Expansion

Expanding gate capacity through a carefully phased intervention integrated seamlessly into an active terminal.

Value Delivered

The project delivered a significant increase in boarding capacity and operational efficiency without compromising passenger experience during construction. Through phased implementation and a restrained architectural approach, the expansion reinforces Terminal 1’s long-term performance and adaptability. The result is a robust, well-integrated upgrade that supports Nice Côte d’Azur Airport’s role as a major international gateway on the Mediterranean.

Project Overview

Between 2017 and 2020, 1PAX was commissioned by Aéroport de la Côte d’Azur to design the expansion of boarding gate facilities at Terminal 1 of Nice Côte d’Azur Airport. Developed in collaboration with SETEC, the project addressed the extension of the terminal through the creation of a new boarding lounge and two additional contact stands, supporting an airport handling up to 5 million passengers. The intervention formed part of a broader effort to modernize aircraft interfaces and improve operational efficiency.

Key Challenge

The principal challenge was to increase boarding capacity and upgrade aircraft stands while maintaining full terminal operations throughout construction. The airport’s high traffic levels required a phased delivery strategy that preserved passenger capacity and service quality over a prolonged construction period, all within the spatial and operational constraints of an existing terminal.

Our Approach

1PAX developed an architectural solution focused on continuity and integration. The extension includes a new boarding lounge and two contact stands, alongside the redesign of all aircraft stands and the replacement of passenger boarding bridges. To minimize disruption, the works were carefully staged over a five-year timeframe, allowing the terminal to remain fully operational at each phase. Architecturally, the new elements were designed to blend smoothly with the existing terminal, respecting its scale, materiality, and spatial logic, while discreetly upgrading performance and functionality.

Place
Nice, France
Year
2017
-
2020
Status
Under Construction
Client
Aéroport de la Côte d’Azur
Architect
1PAX
Cost
15M €
Capacity
5M PAX
Partners
SETEC
Service
Airports & Railstations
Team Members
1PAX Team
Team Leader